Drilling of wells

040707_059

 

Drilling of oil and gas wells

Ready to provide and perform:

Modern drilling rig and additional equipment with regard to the drilling program, drilling equipment selection: including BOP’s – 350-1050 atm, drilling BHA’s till 6000m, 600-1600hp mud pumps, TOP DRIVE up to 600t, circulating system up to 300m³ and other necessary equipment.

Drilling operations supervised by drilling engineers and mud engineers.

Optimization of drilling operations with the help of the European E&P experts

Adjustment of a drilling rig to optimal operational conditions

Construction of rig site territory

Drilling operation and service optimization

We employ only professional staff to provide mud service for drilling and successful completion of a well.

Casing and tubing running services.

We are ready to help you out with bit service and a qualified cementing job

Our aim is to perform a good quality drilling operations within the approved budget for oil or gas production. We offer modern experience in drilling like HP HT and reliable tools to reach the set goals.

1) Mobilization with rig up in Ukraine.

2) Drilling within a project in maximum short terms in compliance to a project and Ukrainian legislation.

3) Rig down, move and rig up at another location

4) We perform tubular running service with use of our own tools and qualified personnel for make up (break out) of casing strings OD 127mm to 340mm with power tong Weatherford CT16K18  and tubing  OD 60,3mm to 114mm with power tong incl. back up Eckel 4-12 STD supplied from Weatherford electrical power unit ex-proof

Drilling company’s bank guarantees are required to secure payment.

Powered by WordPress | Designed by: Compare Premium WordPress Themes | Thanks to Best WordPress Themes, wordpress themes 2011 and